12000kn cold drawing unit put into operation
Time : 2021/11/20 16:57:12
The key equipment 4.3m reducer was imported from Ukraine and installed in November 2008. It lasted five months and was put into trial production on March 5, 2009. It can draw 1m stainless steel pipe at most.